Opening Adjacency Lab…
Ireland School Schedule of Accommodation
Number of spaces, area, description and total area, then internal walls, circulation, plant, stairs and lifts and a float as rows below the room list.
- Columns, in order: No. of Spaces, Area, Description of Space, Total Area.
- The Irish Department of Education's school schedules list each space by number, area and description, and build the gross area as rows below the room list.
- Internal walls (6% to 7%) and circulation (18%) are taken on the net area, plant and each stair and lift are fixed areas you set per project, and a float of 10% closes the schedule.
- Use it for primary and post-primary school projects in Ireland.
- The whole building: Internal walls: 7% of the net area.
- The whole building: Circulation: 18% of the net area.
- The whole building: Plant: a fixed area set per project.
- The whole building: Stairs and lifts: a fixed area set per project.
- The whole building: Float: 10% of the running total.
- Free on every plan: opens in the Adjacency Lab Sheet from the Programs Library.