Opening Adjacency Lab…
Germany DIN 277 Area Schedule Template
A German room program in DIN 277 terms: numbered rooms with usable area group, count, room size, total and remarks, then technical and circulation area.
- Columns, in order: No., Room, Usable Area Group, Count, Room Size, Total, Remarks.
- A German room program (Raumprogramm) lists usable floor area only. Rooms are numbered by department (1.01, 1.02), and each carries its DIN 277 usable area group, one of seven: living, office work, production, storage, education, healing and other, with its count, room size, total and remarks.
- Technical area and circulation area are added afterward to reach the net room area, and construction area to reach the gross floor area. The layout starts them at typical shares, about 5% technical, 18% circulation and 13% construction, for you to set per project.
- Use it for school and public building programs in Germany.
- The whole building: Technical area: 5% of the net area.
- The whole building: Circulation area: 18% of the net area.
- The whole building: Construction area: 13% of the running total.
- Free on every plan: opens in the Adjacency Lab Sheet from the Programs Library.